These criteria include minimum labor intensity and machine time, minimum cost, enhanced quality and safety.
Yuriy Kazakov, Aleksandr Birjukov 2017, 'FAST ASSEMBLY OF QUALITY SUSPENDED VENTILATED FACADES', Architecture and Engineeringhttp://aej.spbgasu.ru/index.php/AE/article/view/91/59. Retrieved from DOAJ CC BY 4.0 (https://creativecommons.org/licenses/by-sa/4.0/legalcode)
The paper discusses a way to minimize the machine time to debug a control program.
Ryazanov Aleksandr, Shvetsov Aleksey 2018, 'Modeling the run of a control program for turning a GTE disk compressor workpieceon a CTX Alpha 500 virtual dual-spindle CNC lathe', MATEC Web of Conferenceshttps://doi.org/10.1051/matecconf/201822404011. Retrieved from DOAJ CC BY 4.0 (https://creativecommons.org/licenses/by-sa/4.0/legalcode)
The results also show that the available machine time and tooling budget have enormous effects on throughput and production cost.
Mussa I. Mgwatu 2011, 'Integration of part selection, machine loading and machining optimisation decisionsfor balanced workload in flexible manufacturing system', International Journal of Industrial Engineering Computationshttp://www.growingscience.com/ijiec/Vol2/IJIEC_2011_23.pdf. Retrieved from DOAJ CC BY 4.0 (https://creativecommons.org/licenses/by-sa/4.0/legalcode)