However, these second level exchanges had a smaller customer line capacity and only had trunk circuits to regional cities.
Retrieved from Wikipedia CC BY-SA 3.0
He spoke after video emerged of customers lining up with trolleys for up to 40 minutes before supermarkets opened.
The Sun
A new switchboard was opened and was equipped for 2,100 customer lines and 200 trunk lines.
Retrieved from Wikipedia CC BY-SA 3.0